Settings → Preferences

App-behavior toggles. These change how setlist presents your work and pre-fills planning dates — they don't change your data.

Where: setlist → Settings → Preferences


Product list

Products layout (default: Table)

The default layout for the Products page — Table or Cards. Both keep the same filters and the same category → sub-category organization. Cards show product status, product line, readiness, and margin in the same two-column grid used by Campaigns and Launches; editing always opens the table layout.

Product page

Progressive product view (default: on)

When on, the product detail page shows one stage's work at a time — completed stages collapse to a one-line summary, and future stages are dimmed until you reach them. Turn it off to see the whole product page expanded at once.

See The Product Workspace → progressive view for how it behaves.

Planning

Design lead time (weeks) (default: not set)

How far ahead of a launch a product's design should be done. setlist pre-fills each product's Target due date as the launch date minus this many weeks — you can still override it per product. Leave blank to skip the auto-filled due date.

Set it up

  1. Pick the Products layout your team reads fastest (table stays the dense operational view).
  2. Choose whether you want the progressive product view (most people leave it on).
  3. Set a design lead time (e.g. 4 weeks) so products get a sensible target due date relative to their launch.

All three settings autosave.

See also